Here are pictures with the concrete poured and done
The clean outs and drain came level with the floor after all
Water drains into the drain when poured anywhere on the floor
The pipe for the Toilet Flange. The collar around the pipe is
merely a spacer (my very own conceptualisation) that Mike
said that I needed in order for the Toilet Flange to be glued
flush with the floor.
No comments:
Post a Comment